The fix is rarely the expensive part. The timing is. The Fix That Costs 40x More in Week 40 Than in Week 4 Here's a pattern I've watched play out on program after program. A device sails through internal bench testing. Engineering is confident. The unit goes to the test lab for formal IEC 60601-1-2 immunity testing, and at 3 V/m radiated RF susceptibility, … [Read more...]


