From the International Electrotechnical Commission webstore:
“IEC 60143-2:2012 covers protective equipment for series capacitor banks with a size larger than 10 Mvar per phase. Protective equipment is defined as the main circuit apparatus and ancillary equipment, which are part of a series capacitor installation, but which are external to the capacitor part itself. The recommendations for the capacitor part are given in IEC 60143-1:2004. The protective equipment is mentioned in Clause 3 and 10.6 of IEC 60143-1:2004.
This second edition cancels and replaces the first edition published in 1994. It constitutes a technical revision. The main changes with respect to the previous edition are:
- updates with respect to new and revised component standards;
- updates with respect to technology changes. Outdated technologies have been removed, [such as] series capacitors with dual self-triggered gaps. New technologies have been added, [such as] current sensors instead of current transformers;
- The testing of spark gaps has been updated to more clearly specify requirements and testing procedures. A new bypass making current test replaces the old discharge current test;
- Clause 5, Guide, has been expanded with more information about different damping circuits and series capacitor protections.”